Tuesday, October 30, 2012

OSHA Links

Use the following links to help with your OSHA studies:

Introduction information
http://www.osha.gov/dte/outreach/teachingaids.html

General Certification - not all the much for the construction OSHA certification
http://www.osha.gov/dte/outreach/construction_generalindustry/gi_outreach_tp.html

Monday, October 29, 2012

Week of October 29



10/29/2012
Tech Doc:  OSHA 10 Certification (First Lesson)
Mod 5 Review

10/30/2012
Mod 5 Assessment
Mod 5 Skills Exam Start
Mod 6 Worksheet
10/31/2012
Continue Mod 5 Skills Exam
Packet Tracer Lab 6.1.1.5 (summary sheet)
Lab 6.1.2: Creating a Network Diagram from Routing Table
  • (Answer questions in your lab manual; Draw the topology using Visio.  Save the drawing as a .PDF file and submit it to the Drop Box folder in ANGEL).
11/1/2012
Continue Module 5 Skills exam
Lab 6.1.5: Configuring and Verifying RIP (Hands-on, Summary Sheet)
PT Lab 6.1.5.3:  Configuring RIP (submit saved file to Drop Box in ANGEL)
11/2/2012
Lab 6.2.4: Configuring BGP with Default Routing

Monday, October 22, 2012

Week of October 22

10/22/2012
Tech Doc:  Article Abstract
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI


10/23/2012
Lab 5.3.7 Configuring DHCP with SDM and the Cisco IOS CLI

ANGEL Drop Box Lab:  Complete the Packet Tracer on screen Lab 5.3.5.4.  This is a 10 + 2 point assignment.  The additional 2 points are for documentation of the Packet Tracer file.  Include your name on the topology of the Packet Tracer topology, and include the assignment and your name on the submitted file to the Drop Box folder in ANGEL.  Example file name:  "Lab 5-3-5 BClark.pkt".  Avoid using periods in file names!


10/24/2012
Lab 5.3.7 Configuring PAT with SDM and Static NAT using Cisco IOS Commands
Lab 5.3.7 Configurning DHCP


10/25/2012
Lab 5.3.8.3 Packet Tracer Configuring Static NAT using Cisco IOS Commands  (summary sheet)


10/26/2012
Wrap up Module 5 Labs
Lab 5.3.9b: Managing Router Configuration Files using TFTP (summary sheet)
Module 5 Review
Wrap up Module 5 Labs
Celebration: Windows 8 Official Release!

Tuesday, October 16, 2012

Week of October 15

10/15/2012
Tech Doc:  Near Field Communication Abstract
More subnetting!

10/16/2012
Port Address Translation!
Lab 4.1.5 - Turn in pages 3, 4, and 5 from the lab.
Lab 4.2.4 - Connect the ISR to the 10.0.0.0/12 network.  Check Off Lab
Seeing subnets through binary eyes


10/17/2012
Wrap up all Module 4 labs

Lab 4-2-4:  Print out summary sheet for Check Off
Packet Tracer 4.2.3.3:  Print off summary sheet

Mod 4 Review

10/18/2012
Mod 4 Quiz
Mod 5 Worksheet
Lab 5.1.3: Powering up an Integrated Services Router

10/19/2012
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI
Lab 5.5.2/5.5.4: Powering up and Configuring a Cisco Catalyst Switch

Tuesday, October 9, 2012

Week of October 8

10/8/2012
Tech Doc:  Article Abstract (Journal Article)
Mod 2 worksheet due
Lab ISR Stack - Check off lab

10/9/2012
Mod 2 Review and Assessment
Mod 3 Worksheet
Lab Manuals in Warehouse - $11.00
Lab 3.2.4.2: Evaluating a Cabling Upgrade Plan

10/10/2012
Module 3 Worksheet due
Work on labs

10/11/2012
Mod 3 Review
Wrap up labs

10/12/2012
Mod 3 assessment
Mod 4 Worksheet
Intro to Subnetting!
Mod 4 Worksheet Lab 4.1.5: Subnetting a Network