Enjoy the time off from Washburn Tech!
I'll be checking my emails at least daily.
Have a safe holiday, and see you on January 7.
Wednesday, December 19, 2012
Monday, December 10, 2012
Week of December 10
12/10/2012
Tech Doc I: OSHA10 Chapter 10 and Final Quiz. Submit certificate to the ANGEL Drop Box, Tech Doc I Lessons Folder.
See last week's blog postings for Practice Tests and Course Evals
All quiz retakes due today
Skills Exams
12/11/2012
Skills Exams
Wrapping up all work
12/12/2012
Coolest day of the year: 12/12/12. And last of its kind for 89 years!
Module 10 Case Study - draw updated topology in Visio. Create working topology in Packet Tracer. 30 point lab assignment.
12/13/2012
CCNA II Online Final (voucher exam!)
12/14/2012
Wrap things up, clean up lab.
Tech Doc I: OSHA10 Chapter 10 and Final Quiz. Submit certificate to the ANGEL Drop Box, Tech Doc I Lessons Folder.
See last week's blog postings for Practice Tests and Course Evals
All quiz retakes due today
Skills Exams
12/11/2012
Skills Exams
Wrapping up all work
12/12/2012
Coolest day of the year: 12/12/12. And last of its kind for 89 years!
Module 10 Case Study - draw updated topology in Visio. Create working topology in Packet Tracer. 30 point lab assignment.
12/13/2012
CCNA II Online Final (voucher exam!)
12/14/2012
Wrap things up, clean up lab.
Monday, December 3, 2012
Week of December 3
12/3/2012
Tech Doc I: OSHA10 work. Working on Chapters 8 & 9
Mod 9 PT Labs
All Module Quiz retakes due December 10
12/4/2012
Mod 9 Review
Mod 9 Quiz activated - due Wednesday
12/5/2012
Remaining Assignments due on Dec 13:
Practice Hands On Skills Exam
Practice Final
12/6/2012
CCENT Practice Exam #1
CCENT Practice Exam #2
Start Hands-On Skills Based Exam
12/7/2012
All Module Quiz retakes due December 10
ANGEL course eval - 75% + 1 = donuts!
NetSpace course evaluation - required for completion!
Tech Doc I: OSHA10 work. Working on Chapters 8 & 9
Mod 9 PT Labs
All Module Quiz retakes due December 10
12/4/2012
Mod 9 Review
Mod 9 Quiz activated - due Wednesday
12/5/2012
Remaining Assignments due on Dec 13:
Practice Hands On Skills Exam
Practice Final
12/6/2012
CCENT Practice Exam #1
CCENT Practice Exam #2
Start Hands-On Skills Based Exam
12/7/2012
All Module Quiz retakes due December 10
ANGEL course eval - 75% + 1 = donuts!
NetSpace course evaluation - required for completion!
Tuesday, November 20, 2012
Week of November 26
11/26/2012
Password Recovery Skills Exam
OSHA10 - Finish Ch 7 by end of week
Mod 8 Review
11/27/2012
Mod 8 Assessment Activated through Thursday
Lab 8.3.3b: Configuring a Remote Router Using SSH
11/28/2012
Mod 9 Worksheet
Lab 9.1.3 Using Wireshark to Observe the TCP Three-way Handshake
11/29/2012
Lab 9.3.3 Designing an IP Subnetting Scheme for Growth - turn in pages from the lab manual.
Lab 9.4.2 Correcting RIPv2 Routing Problems
11/30/2012
Mod 8 Quiz - one more day!
Engineering Journal Quiz
Lab 9.5.3 Using Telnet and SSH to Access Networking Devices
Mod 9 Worksheet Due
Password Recovery Skills Exam
OSHA10 - Finish Ch 7 by end of week
Mod 8 Review
11/27/2012
Mod 8 Assessment Activated through Thursday
Lab 8.3.3b: Configuring a Remote Router Using SSH
11/28/2012
Mod 9 Worksheet
Lab 9.1.3 Using Wireshark to Observe the TCP Three-way Handshake
11/29/2012
Lab 9.3.3 Designing an IP Subnetting Scheme for Growth - turn in pages from the lab manual.
Lab 9.4.2 Correcting RIPv2 Routing Problems
11/30/2012
Mod 8 Quiz - one more day!
Engineering Journal Quiz
Lab 9.5.3 Using Telnet and SSH to Access Networking Devices
Mod 9 Worksheet Due
Monday, November 19, 2012
Week of November 19
11/19/2012
OSHA10: Chapter 5
Lab 8.3.1: Interpreting a Service Level Agreement
11/20/2012
Lab 8.2.5: Researching an Anti-X Software Product - Submit proposals to Drop Box folder in Lessons tab on ANGEL.
Password Recovery and Routing Skills Exam
11/21/2012
No School - Thanksgiving Break
11/22/2012
No School - Thanksgiving Break
11/23/2012
No School - Thanksgiving Break
11/24/2012
Holiday Parade in Downtown Topeka - Check out the WTech Float! The parade starts at 6:00 pm. Sign up for the 5K run benefitting the Topeka Rescue Mission. I'll be there. Here's the link: http://trmonline.org/rescuerun/
OSHA10: Chapter 5
Lab 8.3.1: Interpreting a Service Level Agreement
11/20/2012
Lab 8.2.5: Researching an Anti-X Software Product - Submit proposals to Drop Box folder in Lessons tab on ANGEL.
Password Recovery and Routing Skills Exam
11/21/2012
No School - Thanksgiving Break
11/22/2012
No School - Thanksgiving Break
11/23/2012
No School - Thanksgiving Break
11/24/2012
Holiday Parade in Downtown Topeka - Check out the WTech Float! The parade starts at 6:00 pm. Sign up for the 5K run benefitting the Topeka Rescue Mission. I'll be there. Here's the link: http://trmonline.org/rescuerun/
Monday, November 12, 2012
Week of Novemember 12
11/12/2012
Tech Doc I: OSHA10 Certification -Modules 3 & 4
Mod 7 Worksheet Due
Catalog donated equipment
11/13/2012
Wrap up Mod 7 Labs
* Password Recovery
* DNS Server
* Hosts File
ISR Routing Lab
Mod 7 Review
11/14/2012
Mod 7 Quiz
Mod 8 Worksheet
Lab 8.2.5: Researching an Anti-X Software Product
Lab 8.3.1: Interpreting a Service Level Agreement
11/15/2012
Lab 8.3.2: Conducting a Network Capture with Wireshark (but use modified topology)
Lab 8.3.3a: Managing Remote Network Devices with Telnet
Lab 8.3.3b Configuring a Remote Router Using SSH
New plans with sub!
Lab 8.3.2: Conducting a network Capture with Wireshark
Lab 8.3.3a: Managing Remote Network Devices with Telnet
* 3-router, 3-person lab. Write down yout teammates on the summary sheet.
Make up and/or retake tests
Another good chance to work on OSHA10
11/16/2012
Labs 8.4.3 a & b: Managing Cisco IOS images
Tech Doc I: OSHA10 Certification -Modules 3 & 4
Mod 7 Worksheet Due
Catalog donated equipment
11/13/2012
Wrap up Mod 7 Labs
* Password Recovery
* DNS Server
* Hosts File
ISR Routing Lab
Mod 7 Review
11/14/2012
Mod 7 Quiz
Mod 8 Worksheet
Lab 8.2.5: Researching an Anti-X Software Product
Lab 8.3.1: Interpreting a Service Level Agreement
11/15/2012
New plans with sub!
Lab 8.3.2: Conducting a network Capture with Wireshark
Lab 8.3.3a: Managing Remote Network Devices with Telnet
* 3-router, 3-person lab. Write down yout teammates on the summary sheet.
Make up and/or retake tests
Another good chance to work on OSHA10
11/16/2012
Labs 8.4.3 a & b: Managing Cisco IOS images
Monday, November 5, 2012
Week of November 5
11/5/2012
Tech Doc I - OSHA10 Certification Work
Mod 6 Review
11/6/2012
Wrap up Module 6 Labs
Mod 6 Skills Exam (Packet Tracer)
11/7/2012
Mod 6 Assessment
Mod 7 Worksheet
Password Recovery Lab
11/8/2012
Lab 7.3.1: Editing the HOSTS file in Windows
Lab 7.3.3.a Examining Cached DNS Information on a DNS Server
11/9/2012
No Class - Staff Inservice
Tech Doc I - OSHA10 Certification Work
Mod 6 Review
11/6/2012
Wrap up Module 6 Labs
Mod 6 Skills Exam (Packet Tracer)
11/7/2012
Mod 6 Assessment
Mod 7 Worksheet
Password Recovery Lab
11/8/2012
Lab 7.3.1: Editing the HOSTS file in Windows
Lab 7.3.3.a Examining Cached DNS Information on a DNS Server
11/9/2012
No Class - Staff Inservice
Tuesday, October 30, 2012
OSHA Links
Use the following links to help with your OSHA studies:
Introduction information
http://www.osha.gov/dte/outreach/teachingaids.html
General Certification - not all the much for the construction OSHA certification
http://www.osha.gov/dte/outreach/construction_generalindustry/gi_outreach_tp.html
Introduction information
http://www.osha.gov/dte/outreach/teachingaids.html
General Certification - not all the much for the construction OSHA certification
http://www.osha.gov/dte/outreach/construction_generalindustry/gi_outreach_tp.html
Monday, October 29, 2012
Week of October 29
10/30/2012 |
|||
Mod 5 Assessment | |||
Mod 5 Skills Exam Start | |||
Mod 6 Worksheet | |||
10/31/2012 | |||
Continue Mod 5 Skills Exam | |||
Packet Tracer Lab 6.1.1.5 (summary sheet) | |||
Lab 6.1.2: Creating a Network Diagram from Routing Table | |||
|
|||
11/1/2012 | |||
Continue Module 5 Skills exam | |||
Lab 6.1.5: Configuring and Verifying RIP (Hands-on, Summary Sheet) | |||
PT Lab 6.1.5.3: Configuring RIP (submit saved file to Drop Box in ANGEL) | |||
11/2/2012 | |||
Lab 6.2.4: Configuring BGP with Default Routing |
Monday, October 22, 2012
Week of October 22
10/22/2012
Tech Doc: Article Abstract
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI
10/23/2012
Lab 5.3.7 Configuring DHCP with SDM and the Cisco IOS CLI
ANGEL Drop Box Lab: Complete the Packet Tracer on screen Lab 5.3.5.4. This is a 10 + 2 point assignment. The additional 2 points are for documentation of the Packet Tracer file. Include your name on the topology of the Packet Tracer topology, and include the assignment and your name on the submitted file to the Drop Box folder in ANGEL. Example file name: "Lab 5-3-5 BClark.pkt". Avoid using periods in file names!
10/24/2012
Lab 5.3.7 Configuring PAT with SDM and Static NAT using Cisco IOS Commands
Lab 5.3.7 Configurning DHCP
10/25/2012
Lab 5.3.8.3 Packet Tracer Configuring Static NAT using Cisco IOS Commands (summary sheet)
10/26/2012
Wrap up Module 5 Labs
Lab 5.3.9b: Managing Router Configuration Files using TFTP (summary sheet)
Module 5 Review
Wrap up Module 5 Labs
Celebration: Windows 8 Official Release!
Tech Doc: Article Abstract
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI
10/23/2012
Lab 5.3.7 Configuring DHCP with SDM and the Cisco IOS CLI
ANGEL Drop Box Lab: Complete the Packet Tracer on screen Lab 5.3.5.4. This is a 10 + 2 point assignment. The additional 2 points are for documentation of the Packet Tracer file. Include your name on the topology of the Packet Tracer topology, and include the assignment and your name on the submitted file to the Drop Box folder in ANGEL. Example file name: "Lab 5-3-5 BClark.pkt". Avoid using periods in file names!
10/24/2012
Lab 5.3.7 Configurning DHCP
10/25/2012
Lab 5.3.8.3 Packet Tracer Configuring Static NAT using Cisco IOS Commands (summary sheet)
10/26/2012
Lab 5.3.9b: Managing Router Configuration Files using TFTP (summary sheet)
Wrap up Module 5 Labs
Celebration: Windows 8 Official Release!
Tuesday, October 16, 2012
Week of October 15
10/15/2012
Tech Doc: Near Field Communication Abstract
More subnetting!
10/16/2012
Port Address Translation!
Lab 4.1.5 - Turn in pages 3, 4, and 5 from the lab.
Lab 4.2.4 - Connect the ISR to the 10.0.0.0/12 network. Check Off Lab
Seeing subnets through binary eyes
10/17/2012
Wrap up all Module 4 labs
Lab 4-2-4: Print out summary sheet for Check Off
Packet Tracer 4.2.3.3: Print off summary sheet
Mod 4 Review
10/18/2012
Mod 4 Quiz
Mod 5 Worksheet
Lab 5.1.3: Powering up an Integrated Services Router
10/19/2012
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI
Lab 5.5.2/5.5.4: Powering up and Configuring a Cisco Catalyst Switch
Tech Doc: Near Field Communication Abstract
More subnetting!
10/16/2012
Port Address Translation!
Lab 4.1.5 - Turn in pages 3, 4, and 5 from the lab.
Lab 4.2.4 - Connect the ISR to the 10.0.0.0/12 network. Check Off Lab
Seeing subnets through binary eyes
10/17/2012
Wrap up all Module 4 labs
Lab 4-2-4: Print out summary sheet for Check Off
Packet Tracer 4.2.3.3: Print off summary sheet
Mod 4 Review
10/18/2012
Mod 4 Quiz
Mod 5 Worksheet
Lab 5.1.3: Powering up an Integrated Services Router
10/19/2012
Lab 5.3.5 Configuring Basic Router Settings with the Cisco IOS CLI
Lab 5.5.2/5.5.4: Powering up and Configuring a Cisco Catalyst Switch
Tuesday, October 9, 2012
Week of October 8
10/8/2012
Tech Doc: Article Abstract (Journal Article)
Mod 2 worksheet due
Lab ISR Stack - Check off lab
10/9/2012
Mod 2 Review and Assessment
Mod 3 Worksheet
Lab Manuals in Warehouse - $11.00
Lab 3.2.4.2: Evaluating a Cabling Upgrade Plan
10/10/2012
Module 3 Worksheet due
Work on labs
10/11/2012
Mod 3 Review
Wrap up labs
10/12/2012
Mod 3 assessment
Mod 4 Worksheet
Intro to Subnetting!
Mod 4 Worksheet Lab 4.1.5: Subnetting a Network
Tech Doc: Article Abstract (Journal Article)
Mod 2 worksheet due
Lab ISR Stack - Check off lab
10/9/2012
Mod 2 Review and Assessment
Mod 3 Worksheet
Lab Manuals in Warehouse - $11.00
Lab 3.2.4.2: Evaluating a Cabling Upgrade Plan
10/10/2012
Module 3 Worksheet due
Work on labs
10/11/2012
Mod 3 Review
Wrap up labs
10/12/2012
Mod 3 assessment
Mod 4 Worksheet
Intro to Subnetting!
Mod 4 Worksheet Lab 4.1.5: Subnetting a Network
Friday, September 28, 2012
Week of October 1
10/1/2012
Continue CCNA I Skills Exams
Cisco Aspire Game
C201 Room Design Due
CCNA I Course Evaluation
Be prepared for OSI Quiz and Eng Jrnl Quiz
10/2/2012
Continue CCNA I Skills Exams
CCNA II Mod 1 Worksheet
Intro to Passport21
10/3/2012
Lab 1.2.3: Mapping ISP Connectivity Using Traceroute
Continue CCNA I Skills Exams (Wrap-up)
10/4/2012
Mod 1 Assessment
Mod 2 Worksheet
Lab 1.2.3 - Mapping ISP Connectivity Using Traceroute. Turn in an annotated version of the tracert output.
If time - work on "Lab ISR Stack". It's in the CCNA 2 Lessons folder.
Mod 1 Worksheet Review
10/5/2012
Mod 1 Assessment
Room C201 Config
Lab Cleanup
Mod 2 Worksheet
Continue CCNA I Skills Exams
Cisco Aspire Game
C201 Room Design Due
CCNA I Course Evaluation
Be prepared for OSI Quiz and Eng Jrnl Quiz
10/2/2012
Continue CCNA I Skills Exams
CCNA II Mod 1 Worksheet
Intro to Passport21
10/3/2012
Lab 1.2.3: Mapping ISP Connectivity Using Traceroute
Continue CCNA I Skills Exams (Wrap-up)
10/4/2012
Lab 1.2.3 - Mapping ISP Connectivity Using Traceroute. Turn in an annotated version of the tracert output.
If time - work on "Lab ISR Stack". It's in the CCNA 2 Lessons folder.
Mod 1 Worksheet Review
10/5/2012
Mod 1 Assessment
Room C201 Config
Lab Cleanup
Mod 2 Worksheet
Monday, September 24, 2012
Week of September 24
9/24/2012
No Class - Staff Inservice
9/25/2012
Mod 8 Review
Mod 9 Worksheet
CCNA Online Skills Based Exam
CCNA I Online Practice Final
Note: The two online practice exams will be activated all week and can be taken multiple times
9/26/2012
Mod 8 Assessment
Mod 9 Review
CCNA I Online Practice Final
9/27/2012
Mod 9 Assessment
CCNA I Skills Exam Starts
Continue Practice Online Exams
9/28/2012
CCNA I Online Final
CCNA I Capstone Project
No Class - Staff Inservice
9/25/2012
Mod 8 Review
Mod 9 Worksheet
CCNA Online Skills Based Exam
CCNA I Online Practice Final
Note: The two online practice exams will be activated all week and can be taken multiple times
9/26/2012
Mod 8 Assessment
Mod 9 Review
CCNA I Online Practice Final
9/27/2012
Mod 9 Assessment
CCNA I Skills Exam Starts
Continue Practice Online Exams
9/28/2012
CCNA I Online Final
CCNA I Capstone Project
Friday, September 14, 2012
Week of September 17
Plans for the Week
9/17/2012
Intro to Visio; Visio Lab Diagram
Wrap up Mod 7 Labs
9/18/2012
Mod 7 Skills Lab
Mod 7 Review
9/19/2012
Module 7 Assessment
Module 8 Worksheet (due Thursday)
Lab 8.4.3: Performing a Vulnerability Analysis
9/20/2012
Lab 8.4.2: Configuring Access Policies and DMZ Settings
9/21/2012
Packet Tracer Skills Lab
Visio: Home Network
9/17/2012
Intro to Visio; Visio Lab Diagram
Wrap up Mod 7 Labs
9/18/2012
Mod 7 Skills Lab
Mod 7 Review
9/19/2012
Module 7 Assessment
Module 8 Worksheet (due Thursday)
Lab 8.4.3: Performing a Vulnerability Analysis
9/20/2012
Lab 8.4.2: Configuring Access Policies and DMZ Settings
9/21/2012
Packet Tracer Skills Lab
Visio: Home Network
Monday, September 10, 2012
Week of September 10
9/10/2012
Employer Ready Resume & Cover Letter
Lab 6.2.1: Observing DNS Name Resolution (Summary Sheet)
WS OSI Model - TCP/IP model
9/11/2012
Lab 6.2.3: Exploring FTP (Summary Sheet)
Lab 6.2.4: Configuring an Email Client (Check Off)
9/12/2012
Mod 6 review
Wrap up all Mod 6 Labs
Student ID Day on WTech Campus - 10:30 or 1:00 are our reserved times. Bring an ID of some type. No cost for your first ID; $10 for a replacement. It's in Conference Center Room CD and you'll need to enter from the hallway, NOT the cafeteria.
Student ID Day on WTech Campus - 10:30 or 1:00 are our reserved times. Bring an ID of some type. No cost for your first ID; $10 for a replacement. It's in Conference Center Room CD and you'll need to enter from the hallway, NOT the cafeteria.
9/13/2012
Mod 6 Online Quiz
Mod 7 Worksheet (due Friday)
Lab 7.2.5: Configuring a Wireless Access Point (Summary Sheet)
9/14/2012
Lab 7.3.5: Configuring Wireless Security (Summary Sheet)
Friday, September 7, 2012
Washburn Tech Web Store
The Washburn Tech web store is open for the next week.
Place your order, print off your cart, pay Katie in the cashier's office, and you'll get your shirt in a couple of weeks.
Place your order, print off your cart, pay Katie in the cashier's office, and you'll get your shirt in a couple of weeks.
Tuesday, September 4, 2012
Week of September 3
9/3/12
Labor Day - No Class!
9/4/12
Mod 4 Online Quiz
Engineering Journal Quiz
Peer to Peer group setup
Mod 5 Worksheet
9/5/12
WS Binary Conversion (Foxtrot)
Mod 5 Worksheet due
Mod 5 Review
9/6/12
Mod 5 Online Quiz
Mod 6 Worksheet (due onFriday Monday)
9/7/12
Lab 6.2.1 - Observing DNS Name Resolution
Lab 6.2.3 - Exploring FTP
Labor Day - No Class!
9/4/12
Mod 4 Online Quiz
Engineering Journal Quiz
Peer to Peer group setup
Mod 5 Worksheet
9/5/12
WS Binary Conversion (Foxtrot)
Mod 5 Worksheet due
Mod 5 Review
9/6/12
Mod 5 Online Quiz
Mod 6 Worksheet (due on
9/7/12
Lab 6.2.1 - Observing DNS Name Resolution
Lab 6.2.3 - Exploring FTP
Sunday, August 26, 2012
Week of August 27
8/27/2012
Wrap up Mod 3 Labs
Review Mod 3 Lab and WS
Review résumés
8/28/2012
Mod 3 online quiz
Cover Letter Worksheet (in Tech Doc I Worksheets folder)
Cover Letter (save in Word format and submit to Tech Doc 1 Drop Box folder)
Module 4 Worksheet (due Wednesday)
8/29/2012
Lab 4.2.3: Tracing Internet Connectivity (summary sheet)
Lab 4.5.3/4.5.5 Building (and testing) Straight-Through and Crossover UTP Cables (check off)
Lab 4.5.4: Terminating UTP cables (check off)
8/30/2012
Lab "Measuring Cable Length" (summary sheet)
Wrap up Mod 4 labs
Review Mod 4 Worksheet
8/31/2012
Mod 4 Online Quiz
Chapter 1 - 4 and Engineering Journal Quiz
Mod 5 Worksheet
Wrap up Mod 3 Labs
Review Mod 3 Lab and WS
Review résumés
8/28/2012
Mod 3 online quiz
Cover Letter Worksheet (in Tech Doc I Worksheets folder)
Cover Letter (save in Word format and submit to Tech Doc 1 Drop Box folder)
Module 4 Worksheet (due Wednesday)
8/29/2012
Lab 4.2.3: Tracing Internet Connectivity (summary sheet)
Lab 4.5.3/4.5.5 Building (and testing) Straight-Through and Crossover UTP Cables (check off)
Lab 4.5.4: Terminating UTP cables (check off)
8/30/2012
Lab "Measuring Cable Length" (summary sheet)
Wrap up Mod 4 labs
Review Mod 4 Worksheet
8/31/2012
Mod 4 Online Quiz
Chapter 1 - 4 and Engineering Journal Quiz
Mod 5 Worksheet
Monday, August 20, 2012
Week of August 20
Aug 20
Review of OWL Writing Guidelines Worksheet
Résumé due
Review of Module 1 Worksheet
Aug 21
Mod 1 Quiz
Mod 2 Worksheet (due Aug 22)
Student Handbook Review
Aug 22
Mod 2 Worksheet Review (due by break)
Mod 2 Quiz
Mod 3 Worksheet (due Thursday)
Lab 3.1.5: Building a Peer-to-Peer Network (Summary Sheet)
Aug 23
Lab 3.3.3/3.3.6: Determine the MAC Address of Host/Determine the IP Address of a Computer (Summary Sheet)
Lab 3.5.2: Addresses and Network Communication (Check off sheet)
Aug 24
Lab 3.6.4/3.6.5: Connect and Configure Hosts/Sharing Resources (Summary Sheet)
Check your email for note about Cisco Learning Network and Reply to me
Mod 3 Review
Review of OWL Writing Guidelines Worksheet
Résumé due
Review of Module 1 Worksheet
Aug 21
Mod 1 Quiz
Mod 2 Worksheet (due Aug 22)
Student Handbook Review
Aug 22
Mod 2 Worksheet Review (due by break)
Mod 2 Quiz
Mod 3 Worksheet (due Thursday)
Lab 3.1.5: Building a Peer-to-Peer Network (Summary Sheet)
Aug 23
Lab 3.3.3/3.3.6: Determine the MAC Address of Host/Determine the IP Address of a Computer (Summary Sheet)
Lab 3.5.2: Addresses and Network Communication (Check off sheet)
Aug 24
Lab 3.6.4/3.6.5: Connect and Configure Hosts/Sharing Resources (Summary Sheet)
Check your email for note about Cisco Learning Network and Reply to me
Mod 3 Review
Friday, August 17, 2012
Good Résumé Resource
You can do lots worse than use Purdue's Online Writing Lab as a reference for the Tech Doc courses.
Here is the link to the résumé writing guidelines.
Answer the worksheet questions. The worksheet is on the Washburn Tech ANGEL site, Lessons Tab, Worksheets folder.
Here is the link to the résumé writing guidelines.
Answer the worksheet questions. The worksheet is on the Washburn Tech ANGEL site, Lessons Tab, Worksheets folder.
Sunday, August 12, 2012
Week of August 13
Welcome to Year 2!
8/13/2012
Welcome to WTech
Review Syllabus
C202 Job Apps
C202 Online Resources (blog site, Twitter Account)
Email Assignment
8/14/2012
Clean up Lab/Start Lab PC Install
Connecting to the 172.16.254.0/24 network
Connecting to My Washburn
Quick overview of User IDs at WU and WTech
8/15/2012
Intro to ANGEL
Intro to NetSpace
Verify WUAD accounts
8/16/2012
Intro to CCNA
Mod 1 Worksheet
Printer Setup
Intro to Packet Tracer
Other admin duties (lockers, etc.)
8/17/2012
CCNA I Mod 1 Worksheet Due
Intro to Technical Documentation Course
Resumé Workshop
8/13/2012
Welcome to WTech
Review Syllabus
C202 Job Apps
C202 Online Resources (blog site, Twitter Account)
Email Assignment
8/14/2012
Clean up Lab/Start Lab PC Install
Connecting to the 172.16.254.0/24 network
Connecting to My Washburn
Quick overview of User IDs at WU and WTech
8/15/2012
Intro to ANGEL
Intro to NetSpace
Verify WUAD accounts
8/16/2012
Intro to CCNA
Mod 1 Worksheet
Printer Setup
Intro to Packet Tracer
Other admin duties (lockers, etc.)
8/17/2012
CCNA I Mod 1 Worksheet Due
Intro to Technical Documentation Course
Resumé Workshop
Thursday, May 17, 2012
Cisco Study Guides
Cisco Press Product Page
Listing of CCNA books produced by Cisco Press
Study Guides
CCNA 640-802 Official Cert Library, Updated, 3rd Edition,
Wendell Odom
This contains two books, one each for the ICND1 and ICND2
tests.
From Amazon.com
CCNA Cisco Certified Network Associate Study Guide, includes
CD-ROM: Exam 640-802 [Paperback], 7th Edition, Todd Lammle
http://amzn.to/LWiF7W
CCNA Test Vouchers
Here is a link to the Cisco NetAcad Help Desk with instructions on getting your CCNA test voucher.
You needed to have scored a 75% on either the CCNA II and CCNA IV online final in order to be voucher eligible.
CCNA Test Vouchers
Here is a link to the Cisco NetAcad Help Desk with instructions on getting your CCNA test voucher.
You needed to have scored a 75% on either the CCNA II and CCNA IV online final in order to be voucher eligible.
Monday, May 14, 2012
Week of May 14
5/14/2012
Tech Doc II - Competency Profiles
All Week - Online Final
Hands-On Skills Exams
Pick up Graduation Gowns 8:30 - 10:30, 12:30 - 3:30
Take the ANGEL Washburn Tech Instructor Surveys - 2012 Spring. Donuts on Wednesday if 85% of you take the survey by Tuesday afternoon.
5/15/2012
Online Final
Hands-On Skills Exams
5/16/2012
Online Final
Hands-On Skills Exams
5/17/2012
Tech Doc II - Speech Quizzes
Last Day at WTech!
Graduation - Start lining up at 6:30 at Lee Arena
5/18/2012
No School - but I'll be here working!
Wednesday, May 9, 2012
IPv6 Skills Exam
The IPv6 Skills Exam has been posted. Look for it in the ANGEL Lessons folder.
It is a Packet Tracer file. Make sure you read the instructions in ANGEL before you download and start the lab.
There is NO Drop Box for this assignment - it is a check off test.
It is a Packet Tracer file. Make sure you read the instructions in ANGEL before you download and start the lab.
There is NO Drop Box for this assignment - it is a check off test.
Tuesday, May 8, 2012
Online Skills Based Exams
I posted that you need to complete three of the four online Skills Based Exams. Now it's down to just one - the DRSEnt PT Practice SBA EIGRP. By the way - DRSEnt stands for Discovery Routing and Switching in the Enterprise, which was the CCNA III course. SBA stands for Skills Based Exam.
I've deactivated the other SBAs.
I've deactivated the other SBAs.
Monday, May 7, 2012
Week of May 7
4/7/2012
Tech Doc II: Job Interview Summary
Lab 7.3.3 - Configuring and Testing RSTP
4/8/2012
Lab 8.2.5 - Configuring and Verify WAN Backup Links (Floating Static Routes)
4/9/2012
Guest Speaker - Don Williams, IT Director at Auburn/Washburn School District. He'll be talking about interviewing tips. AM - 10:00, PM - 11:45
CCNA IV Online Practice Final
4/10/2012
Online Skills Based Exams - Complete three of the four activated SBA's.
4/11/2012
Washburn Tech BBQ & Car Show!
Online Skills Based Exams
May 7, 2012
For this week - lots of Network Academy Assessments
Work on the SBA (Skills Based Assessements) that have been posted. Three of the four are due by Friday.
Complete the Online Practice Final. Note: The CCNA IV Online Final is a voucher exam and worth $$$!
Only new labs this week:
Lab 7.3.3 - Configuring and Testing the Rapid Spanning Tree Prototype. Option, but highly recommended.
Lab 8.2.5 - Important to learn about Floating Static Routes
Labs 8.3.4A/8.3.4B - VPN labs - you'll need to find a version of Java that works with Security Device Manager (SDM) and the Cisco 64 bit VPN client. I can help with both of those software installs. Totally optional, and you'll take a full day installing software and making it work. Requires a 2811 router.
Work on the SBA (Skills Based Assessements) that have been posted. Three of the four are due by Friday.
Complete the Online Practice Final. Note: The CCNA IV Online Final is a voucher exam and worth $$$!
Only new labs this week:
Lab 7.3.3 - Configuring and Testing the Rapid Spanning Tree Prototype. Option, but highly recommended.
Lab 8.2.5 - Important to learn about Floating Static Routes
Labs 8.3.4A/8.3.4B - VPN labs - you'll need to find a version of Java that works with Security Device Manager (SDM) and the Cisco 64 bit VPN client. I can help with both of those software installs. Totally optional, and you'll take a full day installing software and making it work. Requires a 2811 router.
Friday, May 4, 2012
May 4, 2012
Happy Star Wars Day!
Complete and submit your team's interview questions, and submit your team's best "Tell me about yourself" question.
Connect to the 10.0.0.0/12 network - see the SSID and WPA2 password posted in the lab for you wireless students.
Look on the NetAcad site for Packet Tracer Skills Based Exams. Print out the hand outs and the topology when you start one - there is addressing you need to do.
Complete and submit your team's interview questions, and submit your team's best "Tell me about yourself" question.
Connect to the 10.0.0.0/12 network - see the SSID and WPA2 password posted in the lab for you wireless students.
Look on the NetAcad site for Packet Tracer Skills Based Exams. Print out the hand outs and the topology when you start one - there is addressing you need to do.
Sunday, April 29, 2012
Thursday, April 26, 2012
Week of April 30
For the programmers in the class:
4/30/2012
Tech Doc II - Presentations (M, W, and Th)
Tech Doc II - Interviews
WS Mod 5
PT Lab 5.2.2.3-Connecting Access and Distribution Layer Switches
5/1/2012
PT Lab 5.2.3.2-Examining WAN Connections
PT Lab 5.3.4.2-Observing Static and Dynamic Routing
PT Lab 5.5.3.2-Implementing Access Control Lists
5/2/2012
All Mod 4 and IPv6 Labs due by today
WS Mod 6
5/3/2012
PT Lab 6.1.1.4: Designing and Addressing a Topology
PT Lab 6.1.3.2: Applying VLSM Addressing You're Welcome!
PT Lab 6.2.3.4: Configuring a Multirouter EIGRP Network
5/4/2012
Wrap up Modules 5 & 6
4/30/2012
Tech Doc II - Presentations (M, W, and Th)
Tech Doc II - Interviews
WS Mod 5
PT Lab 5.2.2.3-Connecting Access and Distribution Layer Switches
5/1/2012
PT Lab 5.2.3.2-Examining WAN Connections
PT Lab 5.3.4.2-Observing Static and Dynamic Routing
PT Lab 5.5.3.2-Implementing Access Control Lists
5/2/2012
All Mod 4 and IPv6 Labs due by today
WS Mod 6
5/3/2012
PT Lab 6.1.1.4: Designing and Addressing a Topology
PT Lab 6.2.3.4: Configuring a Multirouter EIGRP Network
5/4/2012
Wrap up Modules 5 & 6
Wednesday, April 25, 2012
IPv6 Labs
Lab 8-1: Configuring OSPF for IPv6 can be done in Packet Tracer.
Labs 8-2 & 8-3 need to be done with live equipment. You can stay within a rack; use the 2811's for R1 and R3, and a 2621 for R2.
Monday, April 23, 2012
Week of April 23
Not totally related, but topical cartoon from Foxtrot that made me laugh.
4/23/2012
No new Tech Doc II this week - Look for schedule for presentations
Get Password Recovery Skills Completed!
Workshet IPv6
4/24/2012
Presentations!
Work on IPv6 labs 8-1, 8-2, and 8-3. All labs can be done in Packet Tracer; at least one must be completed with live equipment.
4/25/2012
WS Mod 4
Lab 4.1.2 - Characterizing Network Applications
4/26/2012
Lab 4.3.4 - Exploring Netwokr QoS
4/27/2012
No class - staff inservice. Not a day off though. Use the time to complete worksheets, Packet Tracer labs, polish your presenation, etc.
Wednesday, April 18, 2012
Thursday, April 19
After Friday, Password Recovery Skills Exam will be penalized as being late!
Another good Dilbert (and related to Module 3)
Tuesday, April 17, 2012
Week of April 16
4/16/2012
Tech Doc II - Common Interview Questions (due Friday)
Work on Wrapping up all Mod 1 - 3 work
4/17/2012
Taxes Submitted?
Lab: Configuring 6to4 Tunnels
4/18/2012
Lab: Lab 8-1, Configuring OSPF for IPv6
Skills Exam: Router/Switch Password Recovery (thru rest of week)
4/19/2012
Lab: Using Manual IPv6 Tunnels with EIGRP for IPv6
4/20/2012
Wrap up Tech Doc II & IPv6 Labs
All Mod 1 -3 work considered late after today.
Tech Doc II - Common Interview Questions (due Friday)
Work on Wrapping up all Mod 1 - 3 work
4/17/2012
Taxes Submitted?
Lab: Configuring 6to4 Tunnels
4/18/2012
Lab: Lab 8-1, Configuring OSPF for IPv6
Skills Exam: Router/Switch Password Recovery (thru rest of week)
4/19/2012
Lab: Using Manual IPv6 Tunnels with EIGRP for IPv6
4/20/2012
Wrap up Tech Doc II & IPv6 Labs
All Mod 1 -3 work considered late after today.
Monday, April 16, 2012
Monday, April 9, 2012
Week of April 9
4/9/12
CCNA III Course Feedback!!!
Tech Doc II - 2nd Presentation - Technical Topic
* Your second presentation will be similar to a "journal article" only in presentation form.
* Topic is due by Tuesday, presentation due by Friday.
Lab 3.2.4 - Installing a Cisco IOS Software Image (including ROMMON)
Lab 3.4.3 - Performating a Wireless Site Survey
Mod 3 Worksheet
4/10/12
Work on Module 3 assignments
4/11/12
Wrap up Mod 3 Assignments
Washburn Tech Career Fair
4/12/12
Mod 4 Worksheet
Start Module 4 Labs
4/13/12
Module 4 Labs
CCNA III Course Feedback!!!
Tech Doc II - 2nd Presentation - Technical Topic
* Your second presentation will be similar to a "journal article" only in presentation form.
* Topic is due by Tuesday, presentation due by Friday.
Lab 3.2.4 - Installing a Cisco IOS Software Image (including ROMMON)
Lab 3.4.3 - Performating a Wireless Site Survey
Mod 3 Worksheet
4/10/12
Work on Module 3 assignments
4/11/12
Wrap up Mod 3 Assignments
Washburn Tech Career Fair
4/12/12
Mod 4 Worksheet
Start Module 4 Labs
4/13/12
Module 4 Labs
Friday, March 30, 2012
Week of April 2
4/2/2012
Pseudo Code Presentation - Due Thursday. Online link to Drop Box folder
Wrap up Skills Exams
Lab 1.4.3: Monitoring VLAN Traffic
Lab 1.4.6: Gaining Physical Access to the Network (router and switch password recovery)
4/3/2012
Mod 1 Online Quiz
Mod 2 Worksheet
Wrap up Skills Exams
4/4/2012
Lab 2.1.6: Observing Traffic Using Cisco Network Assistant
Lab 2.5.2: Monitoring Network Performance
Wrap up Skills Exams
4/5/2012
Wrap up all labs
PseudoCode presentation due
4/6/2012
No class - Spring Holiday!
Pseudo Code Presentation - Due Thursday. Online link to Drop Box folder
Wrap up Skills Exams
Lab 1.4.3: Monitoring VLAN Traffic
Lab 1.4.6: Gaining Physical Access to the Network (router and switch password recovery)
4/3/2012
Mod 1 Online Quiz
Mod 2 Worksheet
Wrap up Skills Exams
4/4/2012
Lab 2.1.6: Observing Traffic Using Cisco Network Assistant
Lab 2.5.2: Monitoring Network Performance
Wrap up Skills Exams
4/5/2012
Wrap up all labs
PseudoCode presentation due
4/6/2012
No class - Spring Holiday!
Wednesday, March 28, 2012
Friday, March 16, 2012
Week of March 26
Week of March 19: Spring Break!
3/26/2012
Exit Exam - Applied Mathematics and Reading for Information
3/27/2012
Passport21; Intro to PowerPoint
Skills Exam Retakes
3/28/2012
Exit Exam - Locating Information
Online Exam Retakes
3/29/2012
Skills Exam Retakes
CCNA IV Mod 1 Worksheet
Lab 1.4.3: Monitoring VLAN Traffic
Lab 1.4.6A & B: Password Recovery
3/30/2012
Wrap up all Skills Exam Retakes
Wrap up all Mod 1 Labs
3/26/2012
Exit Exam - Applied Mathematics and Reading for Information
3/27/2012
Passport21; Intro to PowerPoint
Skills Exam Retakes
3/28/2012
Exit Exam - Locating Information
Online Exam Retakes
3/29/2012
Skills Exam Retakes
CCNA IV Mod 1 Worksheet
Lab 1.4.3: Monitoring VLAN Traffic
Lab 1.4.6A & B: Password Recovery
3/30/2012
Wrap up all Skills Exam Retakes
Wrap up all Mod 1 Labs
Friday, March 9, 2012
Week of March 12
3/12/2012
Tech Doc II - 3rd KeyTrain Quiz due by Friday; WorkKeys exit exams on the 26th and 28th
CCNA III Practice Final activated through Wednesday
All CCNA III tests need to be 70% or better by end of week
CCNA III Hands-On Skills Exams Start!
Mod 9 WS and Online Quiz due by Wednesday. Online quiz will be open book and count as a 20 point lab assignment.
3/13/2012
CCNA III Skills Exams
Mod 9 Online Quiz (25 20 pt lab assignment)
Test Retakes
3/14/2012
CCNA III Skills Exams
3/15/2012
CCNA III Final
CCNA III Skills Exams
3/16/2012
CCNA III Skills Exams
Tech Doc II - 3rd KeyTrain Quiz due by Friday; WorkKeys exit exams on the 26th and 28th
CCNA III Practice Final activated through Wednesday
All CCNA III tests need to be 70% or better by end of week
CCNA III Hands-On Skills Exams Start!
Mod 9 WS and Online Quiz due by Wednesday. Online quiz will be open book and count as a 20 point lab assignment.
3/13/2012
CCNA III Skills Exams
Mod 9 Online Quiz (
Test Retakes
3/14/2012
CCNA III Skills Exams
3/15/2012
CCNA III Final
CCNA III Skills Exams
3/16/2012
CCNA III Skills Exams
Sunday, March 4, 2012
Week of March 5
Mod 7 Skills Exam
Mod 8 Worksheet Due
Mod 8 Labs:
Lab 8.3.6: Configuring and Verifying VTY Restrictions(live equipment, check off)
Lab 8.4.5 Configuring and Verifying ACLs to filter Inter-VLAN Traffic(live equipment, no summary sheet, check off)
Labs 8.5.1 & 8.5.2 Console and Syslog loggin (live equipment, check off)
Tech Doc II - 2nd Keytrain Quiz due by end of the week
3/6/2012
Continue Mod 8 Labs
3/7/2012
Continue Mod 8 Labs
Mod 8 Review
3/8/2012
Mod 8 Assessment
Mod 9 Worksheet
CCNA III Online Practice Final (available thru 3/14)
3/9/2012
Skills Exam Practice
Mod 9 Troubleshooting Labs
Mod 8 Worksheet Due
Mod 8 Labs:
Lab 8.3.6: Configuring and Verifying VTY Restrictions(live equipment, check off)
Lab 8.4.5 Configuring and Verifying ACLs to filter Inter-VLAN Traffic(live equipment, no summary sheet, check off)
Labs 8.5.1 & 8.5.2 Console and Syslog loggin (live equipment, check off)
Tech Doc II - 2nd Keytrain Quiz due by end of the week
3/6/2012
Continue Mod 8 Labs
3/7/2012
Continue Mod 8 Labs
Mod 8 Review
3/8/2012
Mod 8 Assessment
Mod 9 Worksheet
CCNA III Online Practice Final (available thru 3/14)
3/9/2012
Skills Exam Practice
Mod 9 Troubleshooting Labs
Thursday, February 23, 2012
Week of February 27
2/27/2012
Tech Doc II: Keytrain (one quiz completed by the end of the week)
Frame Relay Labs
2/28/2012
Frame Relay Labs
Mod 7 Review
2/29/2012
Extra Day!
Mod 7 Online Quiz
Mod 7 Skills Exam
3/1/2012
Mod 8 Worksheet
Lab 8.3.3: Configuring and Verifying Standard ACLs (Packet Tracer)
Lab 8.3.4: Planning, Configuring, and Verifying Extended ACLs (PT)
3/2/2012
Lab 8.3.5: Configuring and Verifying Extended Named ACLs (Checkoff Lab)
Tech Doc II: Keytrain (one quiz completed by the end of the week)
Frame Relay Labs
2/28/2012
Frame Relay Labs
Mod 7 Review
2/29/2012
Extra Day!
Mod 7 Online Quiz
Mod 7 Skills Exam
3/1/2012
Mod 8 Worksheet
Lab 8.3.3: Configuring and Verifying Standard ACLs (Packet Tracer)
Lab 8.3.4: Planning, Configuring, and Verifying Extended ACLs (PT)
3/2/2012
Lab 8.3.5: Configuring and Verifying Extended Named ACLs (Checkoff Lab)
Tuesday, February 21, 2012
Week of February 20
2/20/2012
No School - President's Day
2/21/2012
Mod 6 Skills Lab - Packet Tracer
2/22/2012
Mod 6 Online Quiz
Mod 7 Worksheet
Lab 7.2.3: Configuring and Verifying a PPP Link (check off)
2/23/2012
Lab 7.2.5: Configuring and Verifying PAP and CHAP Authentication (check off)
2/24/2012
KeyTrain - One quiz completed
Wrap up Mod 7 Labs
No School - President's Day
2/21/2012
Mod 6 Skills Lab - Packet Tracer
2/22/2012
Mod 6 Online Quiz
Mod 7 Worksheet
Lab 7.2.3: Configuring and Verifying a PPP Link (check off)
2/23/2012
Lab 7.2.5: Configuring and Verifying PAP and CHAP Authentication (check off)
2/24/2012
KeyTrain - One quiz completed
Wrap up Mod 7 Labs
Friday, February 10, 2012
Week of February 13
2/13/2012
Mod 5 Lab Wrapup
Mod 5 Packet Tracer Skills Exam
2/14/2012
Labs 6.2.1 & 6.2.2: Configuring and Verifying Single Area OSPF &
Configuring OSPF Authentication
Lab 6.2.3.2: Controlling a DR/BDR Election (check off lab)
2/15/2012
Mod 6 Worksheet Due
Lab 6.2.3.5: Configuring OSPF Parameters (check off lab)
2/16/2012
Lab 6.3.1: Configuring and Propagating an OSPF Default Route (check off lab)
2/17/2012
Wrap up Module 6 Labs
Mod 6 Review
Mod 5 Lab Wrapup
Mod 5 Packet Tracer Skills Exam
2/14/2012
Labs 6.2.1 & 6.2.2: Configuring and Verifying Single Area OSPF &
Configuring OSPF Authentication
Lab 6.2.3.2: Controlling a DR/BDR Election (check off lab)
2/15/2012
Mod 6 Worksheet Due
Lab 6.2.3.5: Configuring OSPF Parameters (check off lab)
2/16/2012
Lab 6.3.1: Configuring and Propagating an OSPF Default Route (check off lab)
2/17/2012
Wrap up Module 6 Labs
Mod 6 Review
Friday, February 3, 2012
Week of February 6
2/6/2012
Finish/Redo Mod 4 Skills Exam
Mod 5 Worksheet (due Tuesday)
Lab 5.1.2: Redundant Network (Draw new topology using Visio)
Lab 5.2.3.2: Configuring RIPv2 with VLSM and Default Route
Propagation (work in pairs with live equipment)
2/7/2012
Lab 5.4.1 (work in pairs with live equipment)
Lab 5.4.2 (can be done in Packet Tracer)
2/8/2012
Wrap up Module 5 Labs
Mod 5 Review
2/9/2012
Mod 5 Assessment
Tech Doc II - KeyTrain
2/10/2012
Staff Inservice - class not in session!
Finish/Redo Mod 4 Skills Exam
Mod 5 Worksheet (due Tuesday)
Lab 5.1.2: Redundant Network (Draw new topology using Visio)
Lab 5.2.3.2: Configuring RIPv2 with VLSM and Default Route
Propagation (work in pairs with live equipment)
2/7/2012
Lab 5.4.1 (work in pairs with live equipment)
Lab 5.4.2 (can be done in Packet Tracer)
2/8/2012
Wrap up Module 5 Labs
Mod 5 Review
2/9/2012
Mod 5 Assessment
Tech Doc II - KeyTrain
2/10/2012
Staff Inservice - class not in session!
Thursday, February 2, 2012
Monday, January 30, 2012
Week of January 30
1/30/2012
Command Reference Sheet (Tech Doc II)
VLSM Worksheet (Lab 2.10.2a & b)
1/31/2012
Wrap up all Mod 4 Labs
Mod 4 Worksheet Review
"Margin" Quiz
2/1/2012
Mod 4 Test
Mod 4 Skills Exam
2/2/2012
Mod 5 Worksheet
Lab 5.1.2: Redundant Network (Draw new topology using Visio)
"Lab 5.2.3.2: Configuring RIPv2 with VLSM and Default Route
Propagation (work in pairs with live equipment)"
2/3/2012
Career Resource Center - Resumes, Cover Letters, Invterviews
Command Reference Sheet (Tech Doc II)
VLSM Worksheet (Lab 2.10.2a & b)
1/31/2012
Wrap up all Mod 4 Labs
Mod 4 Worksheet Review
"Margin" Quiz
2/1/2012
Mod 4 Test
Mod 4 Skills Exam
2/2/2012
Mod 5 Worksheet
Lab 5.1.2: Redundant Network (Draw new topology using Visio)
"Lab 5.2.3.2: Configuring RIPv2 with VLSM and Default Route
Propagation (work in pairs with live equipment)"
2/3/2012
Career Resource Center - Resumes, Cover Letters, Invterviews
Thursday, January 26, 2012
January 27
Change of Plans!
Lab 4.4.4.3: Configuring and Verifying PAT (summary sheet)
Command Reference Guide (first draft due today!)
Lab 4.4.4.3: Configuring and Verifying PAT (summary sheet)
Command Reference Guide (first draft due today!)
Friday, January 20, 2012
Week of January 23
1/23/2012
Broadcast Storm Lab
Packet Tracer Skills Lab
1/24/2012
Mod 3 Assessment
Mod 4 Worksheet
Intro to VLSM
Lab 4.2.5:Calculating a VLSM Addressing Scheme (from lab manual)
1/25/2012
Lab 4.3.3: Calculating Route Summarization (from lab manual)
Lab 4.3.4: Configuring a LAN with Discontiguous Subnets (summary sheet)
1/26/2012
Mod 4 Worksheet due
Lab 4.4.3: Configuring and Verifying Static NAT
1/27/2012
Tech Doc II: Career Resource Center - Job Seminar (Room AE156 [old 306A])
Broadcast Storm Lab
Packet Tracer Skills Lab
1/24/2012
Mod 3 Assessment
Mod 4 Worksheet
Intro to VLSM
Lab 4.2.5:Calculating a VLSM Addressing Scheme (from lab manual)
1/25/2012
Lab 4.3.3: Calculating Route Summarization (from lab manual)
Lab 4.3.4: Configuring a LAN with Discontiguous Subnets (summary sheet)
1/26/2012
Mod 4 Worksheet due
Lab 4.4.3: Configuring and Verifying Static NAT
1/27/2012
Tech Doc II: Career Resource Center - Job Seminar (Room AE156 [old 306A])
Sunday, January 15, 2012
Week of January 16
1/16/2012
Martin Luther King Day - Class not in session
1/17/2012
Tech Doc II - Tasks Lists (Due Wednesday)
Lab 3.4.1 - Creating VLANs and Assigning Ports
Responsible for all syntax in Packet Tracer Labs in Mod 3!
1/18/2012
Lab 3.4.2 - Configuring a Trunk Port to Connect Switches
Mod 3 Worksheet Due
1/19/2012
Lab 3.4.3b - Configuring Inter-VLAN Routing (Router on a Stick)
1/20/2012
Wrap up all Labs
Mod 3 Worksheet Review
Martin Luther King Day - Class not in session
1/17/2012
Tech Doc II - Tasks Lists (Due Wednesday)
Lab 3.4.1 - Creating VLANs and Assigning Ports
Responsible for all syntax in Packet Tracer Labs in Mod 3!
1/18/2012
Lab 3.4.2 - Configuring a Trunk Port to Connect Switches
Mod 3 Worksheet Due
1/19/2012
Lab 3.4.3b - Configuring Inter-VLAN Routing (Router on a Stick)
1/20/2012
Wrap up all Labs
Mod 3 Worksheet Review
Friday, January 6, 2012
Week of January 9
1/9/2012
Tech Doc II - Bare Bones Resume (due Wednesday)
Wrap up Mod 1 Lab
Mod 1 Review
1/10/2012
Mod 1 Assessment
Mod 2 Worksheet
Lab 2.3.5: Configuring Basic Routing and Switching (good review lab)
1/11/2012
Wrap up Mod 2 Labs
Wrap up Tech Doc II assignment
Mod 2 Review
---
MOTD Banner Lab
1/12/2012
Mod 2 Assessment
Mod 3 Worksheet
Lab 3.1.4: Applying Basic Switch Security
1/13/2012
Lab 3.2.3 & 3.2.4: Building a Switched Network with Redundant Links & Verifying STP with Show Commands
Tech Doc II - Bare Bones Resume (due Wednesday)
Wrap up Mod 1 Lab
Mod 1 Review
1/10/2012
Mod 1 Assessment
Mod 2 Worksheet
Lab 2.3.5: Configuring Basic Routing and Switching (good review lab)
1/11/2012
Wrap up Mod 2 Labs
Wrap up Tech Doc II assignment
Mod 2 Review
---
MOTD Banner Lab
1/12/2012
Mod 2 Assessment
Mod 3 Worksheet
Lab 3.1.4: Applying Basic Switch Security
1/13/2012
Lab 3.2.3 & 3.2.4: Building a Switched Network with Redundant Links & Verifying STP with Show Commands
Wednesday, January 4, 2012
Week of January 2 (Short One!)
1/5/2012
Start of CCNA III - Introducing Routing and Switching in the Enterprise
CCNA II Skills exam rehash
Lab Refresh
CCNA III PreTest
1/6/2012
CCNA III Lab Manual Exam
Module 1 Worksheet
Lab 1.2.2: Capturing and Analyzing Network Traffic
Start of CCNA III - Introducing Routing and Switching in the Enterprise
CCNA II Skills exam rehash
Lab Refresh
CCNA III PreTest
1/6/2012
CCNA III Lab Manual Exam
Module 1 Worksheet
Lab 1.2.2: Capturing and Analyzing Network Traffic
Subscribe to:
Posts (Atom)