Thursday, April 26, 2012

Week of April 30

For the programmers in the class:












4/30/2012
Tech Doc II - Presentations (M, W, and Th)
Tech Doc II - Interviews
WS Mod 5
PT Lab 5.2.2.3-Connecting Access and Distribution Layer Switches

 5/1/2012
PT Lab 5.2.3.2-Examining WAN Connections
PT Lab 5.3.4.2-Observing Static and Dynamic Routing
PT Lab 5.5.3.2-Implementing Access Control Lists

 5/2/2012
All Mod 4 and IPv6 Labs due by today
WS Mod 6

 5/3/2012
PT Lab 6.1.1.4: Designing and Addressing a Topology
PT Lab 6.1.3.2: Applying VLSM Addressing You're Welcome!
PT Lab 6.2.3.4: Configuring a Multirouter EIGRP Network

 5/4/2012
Wrap up Modules 5 & 6

Wednesday, April 25, 2012

IPv6 Labs

Lab 8-1: Configuring OSPF for IPv6 can be done in Packet Tracer. Labs 8-2 & 8-3 need to be done with live equipment. You can stay within a rack; use the 2811's for R1 and R3, and a 2621 for R2.

Monday, April 23, 2012

Week of April 23


Not totally related, but topical cartoon from Foxtrot that made me laugh.

4/23/2012
No new Tech Doc II this week - Look for schedule for presentations
Get Password Recovery Skills Completed!
Workshet IPv6

4/24/2012
Presentations!
Work on IPv6 labs 8-1, 8-2, and 8-3.  All labs can be done in Packet Tracer; at least one must be completed with live equipment.

4/25/2012
WS Mod 4
Lab 4.1.2 - Characterizing Network Applications

4/26/2012
Lab 4.3.4 - Exploring Netwokr QoS

4/27/2012
No class - staff inservice.  Not a day off though.  Use the time to complete worksheets, Packet Tracer labs, polish your presenation, etc.

Wednesday, April 18, 2012

Thursday, April 19

After Friday, Password Recovery Skills Exam will be penalized as being late!



Another good Dilbert (and related to Module 3)


Tuesday, April 17, 2012

Week of April 16

4/16/2012
Tech Doc II - Common Interview Questions (due Friday)
Work on Wrapping up all Mod 1 - 3 work

4/17/2012
Taxes Submitted?
Lab:  Configuring 6to4 Tunnels

4/18/2012
Lab: Lab 8-1, Configuring OSPF for IPv6

Skills Exam: Router/Switch Password Recovery (thru rest of week)

4/19/2012
Lab: Using Manual IPv6 Tunnels with EIGRP for IPv6


4/20/2012
Wrap up Tech Doc II & IPv6 Labs
All Mod 1 -3 work considered late after today.

Monday, April 16, 2012

Monday, April 9, 2012

Week of April 9

4/9/12
CCNA III Course Feedback!!!

Tech Doc II - 2nd Presentation - Technical Topic
* Your second presentation will be similar to a "journal article" only in presentation form.
* Topic is due by Tuesday, presentation due by Friday.

Lab 3.2.4 - Installing a Cisco IOS Software Image (including ROMMON)
Lab 3.4.3 - Performating a Wireless Site Survey
Mod 3 Worksheet

4/10/12
Work on Module 3 assignments

4/11/12
Wrap up Mod 3 Assignments
Washburn Tech Career Fair

4/12/12
Mod 4 Worksheet
Start Module 4 Labs

4/13/12
Module 4 Labs